The first hard freeze ends the patio season here. Iowa State University Extension says the ground in much of Iowa typically freezes by late November and thaws around mid-March, and paver standards are clear that base and pavers don’t go down over frozen soil. So from about Thanksgiving to about St. Patrick’s Day, we aren’t laying patios.
That doesn’t mean nothing is happening. Winter splits our work in two. Snow in Ankeny, and the planning that decides what next summer looks like.
Here’s the honest version of both.
The Ankeny snow route runs all winter
Snow removal is the part of our winter people actually see. It’s also the most limited part of what we do, and that’s on purpose.
We only offer snow removal in Ankeny. Not the whole metro, not even the towns next door. A short route is the only way we can promise a real response window after a storm. If we ran plows from Ankeny to Waukee, nobody on the list would get a straight answer about when we’d arrive.
Once you’re on the route, you’re on it for the season. You don’t call after every storm. When it snows, we watch the forecast, run the route, and clear what we agreed to clear: driveways, walkways and entrances for homes, lots and high traffic areas for businesses. If you asked for ice control, we treat the spots where ice builds up and somebody eventually slips.
The time to get on the list is before the first real storm, when there’s room to walk the property, mark the priority areas and agree on what to expect. The morning after eight inches is the worst possible time to start that conversation.
Meanwhile, next spring gets decided
The frozen months are when the decisions happen. Paver work waits on the thaw, but nothing about your project has to wait with it.
We can walk the yard, take measurements, settle the layout and work up a quote while there’s snow on the ground. That means when the ground is finally ready, the crew isn’t standing around waiting on a decision that could have been made in January.
A few things worth settling early:
- Size. How much space you actually want, not just what fits today.
- Slope. A yard that falls away from the house needs more excavation, and sometimes a small retaining wall, to end up flat.
- Add-ons. Fire pits, seat walls, steps, lighting. Designing the full picture now is what keeps phase two from tearing up phase one.
- Access. A gate that’s too narrow for equipment is much cheaper to discover in February than on day one.
We wrote about the fall side of this in why fall is the time to plan a spring patio. Winter is the same conversation with colder hands. If you want to see what we build, start with Des Moines paver patios or Ankeny paver patios.
The yard walk and the quote are free. We can’t price a patio we haven’t seen.
The people who build it stay here
One reason winter planning works is that the crews don’t disappear. Our crew leaders are year round, and they’re the ones who run installs from layout to final walkthrough in July. That’s a big part of why the plan you settle in January still matches the patio you get in June.
We’re hiring for a few roles right now, including an operations manager and a crew leader. If you or someone you know wants to build hardscape for a living, the openings are on our careers page.
Two lists, one phone number
Winter work here comes down to which list you belong on.
If you want your driveway and walkways handled after a storm, you need the Ankeny snow route, and you need to be on it before the snow flies.
If you want a patio, a retaining wall, drainage work or an outdoor kitchen next season, now is when the design and the number get settled.
Either way, call us at 515-809-0690 or send a note through our contact page. For snow, the Ankeny snow removal page has the details and the request form.
Nick started building landscapes around the metro in 2009, and Tebock’s has been at it since 2020. Winter is quieter, but it’s not empty.